Field Labs / 01

Put your plan
to the test.

Change the assumptions. See what holds, what fails, and what to measure next.

Interactive / Energy planning

Power Resilience Lab

Build an appliance budget and simulate up to 14 days with batteries, solar, and changing weather. Inspect demand, losses, reserve, and energy shortfalls.

Build your outage plan
Hourly planning model

Will your backup power last?

Hourly accounting.
Visible assumptions.
No account required.
Quick battery runtime estimate

For a single constant load, start here. Use the full planner for schedules, multiple stations and solar.

Enter your equipment values to estimate runtime.

Illustrative defaults, not measured performance. Assumes a fully charged battery, constant load, and no charging. Check your inverter’s continuous and starting-power limits separately.